Max

SPRINT

25-Day Mind to Market Intelligence System

Authorized access only
Max

SPRINT

25-Day Mind to Market Intelligence System
Trend Trial & Quick Response  |  Max Fashion
0
Stores
0
States
0
Days
0
Vendors
Abhishek Singh  |  Fusion Wear  |  AI & Digital Stack  |  Max Fashion
Scroll to explore
Regular orders take 75-90 days.
By the time we react, the trend is dead.
Bangladesh, China, Nepal โ€” the full process from design to floor takes 75-90 days. We don't need to work faster. We need to eliminate steps.
Regular Orders (Bangladesh ยท China ยท Nepal)75-90 days
75-90d
SPRINT (India only)25 days
25d
Origin Transit
-30 days saved
🎨
Fabric Development
-15 days (digital print)
👗
Sampling
-10 days (virtual fit)
QA
-5 days (in-line)
📦
Consolidation
-5 days (vendor-to-DC)
📝
Approvals
-6 days (one committee)
Two engines. One objective.
Trend Trial creates new. Quick Response replicates winners. Together they form a closed-loop system that turns signals into revenue.
🎯
External Signal

Trend Trial

Test new trends. 500 pcs. 4 weeks. Go big or kill.

  • New style creation from external trend
  • 500 pcs across 10-16 signal stores
  • 4-week selling window
  • GO BIG / CAUTION / KILL decision
Internal Signal

Quick Response

Replug proven sellers. Demand-proportional. 25 days.

  • Exact replug of existing best-seller
  • Demand-proportional quantity
  • 25-day turnaround
  • Auto-trigger if score ≥ 75
Three weapons that make 25 days possible.
🎨

Digital Print

Zero setup. Unlimited colors. File to fabric in 2 days.

MOQ: 50 meters | 16 Jaipur vendors
🏭

Vendor Panel

197 India vendors. Jaipur prints. Tirupur knits. Noida wovens.

Pre-approved fabric base | No development
🚚

Express SCM

Floor-ready at vendor. Cross-dock at DC. 24-hour GRN.

Bypasses 5-7 day DC queue
The cost of knowing.
Yes, unit cost is higher at 500 pcs. But the question is not "how much per piece?" It's "how much does a missed trend cost?"
Rs.2L
Test cost (500 pcs)
vs
Rs.10Cr
Missed trend cost
Landed Cost
Rs.193Rs.395
IMU
72%44%
Scale Restores
Full Margin
At GO BIG scale, rotary print restores full margin.
4 phases. 6 months. One objective.
Start small, learn fast, scale deliberately. Cycle 1 will break. That is the point.
01

Foundation

Week 1-4

Vendor panel finalized. SCM Express Lane SOP signed. Store clusters defined via AI. First TT committee formed.

02

First Cycle

Week 5-9

TT-1 launches: 2 articles, 500 pcs each, 14 stores. Full 25-day pipeline end-to-end. Every failure documented.

03

Iteration

Week 10-13

TT-2 with lessons from TT-1. QR Engine tested on one mainline best-seller. Committee rhythm established.

04

Scale

Month 4-6

TT-3 through TT-6 in parallel. 2 articles per cycle, 4-8 in-flight. QR auto-triggers live. Full SPRINT rhythm.

"Cycle 1 will break. That is the point. You cannot optimize a process you have never run."
SPRINT Intelligence

Drop a photo, paste a URL, or describe your product. AI does the rest.

๐Ÿ“ท
Drop product photos or collection board
Supports images, screenshots, mood boards โ€” or paste a product URL below
OR FILL MANUALLY
Advanced Options
Region
Income
Trend
Read the signal. Make the call.
Try: Crop Top ✓ Try: Tunic ✗
Advanced: Metro/Conservative Split

Multi-Style Tracker

Try: Best Seller ✓ Try: Slow Mover ✗
Advanced Options
25 days. Every day mapped.

Every day has an owner, a gate, a risk, and an output. If a gate is missed, the article slips to next cycle. No rushing through.

Design
D0-D2
3 days
โ†’
Print/Fabric
D3-D5
3 days
โ†’
Production
D6-D14
9 days
โ†’
Pack+Ship
D15-D20
6 days
โ†’
Stores
D21-D25
5 days
โ†’
Signal Read
Wk 1-4
Verdict
25
Days to Floor
500
Pieces per Trial
14
Signal Stores
4
Weeks to Verdict
Day-by-Day Breakdown โ€” click any day to expand
Trigger
D0
โ†’
Alloc+PO
D1-D2
โ†’
Production
D3-D14
โ†’
Pack+QA
D15-D18
โ†’
DC+Transit
D19-D23
โ†’
Floor
D24-D25
Day-by-Day Breakdown โ€” click any day to expand

Guardrails

  • Max 3 QR POs per week across all departments
  • Same vendor, same specs as original PO
  • No design modifications allowed on QR orders
  • Return rate > 8% = auto-block from future QR
Mainline + Trend Trial: How they coexist.

Trend Trial cycles run parallel to mainline seasons. Each TT cycle is an independent 25-day sprint with its own verdict date.

Max 2 new TT articles per cycle. Up to 8 in-flight at any time. Committee meets every Wednesday.